Klimor serviceEVO, KCO, KCX

Service and repair of Klimor air handling units.
We work with manufacturing plants and public facilities across Poland.

Klimor EVO KCO KCX air handling unit - air handling unit service
Klimor logo - Klimor air handling unit manufacturer
  • Control system repair
  • Controller repair (uPC, Klimor, Clima Gold, VBW)
  • Filter replacement (G4, F7, F9, HEPA classes)
  • Inverter replacement and repair

We work in buildings where ventilation has to keep running.

We work in manufacturing plants, public institutions and educational facilities across Poland.

01 — Commercial sector

  • Iglotex
  • Saxdor Yachts
  • Hochland
  • Ostrovit
  • Park Naukowo-Technologiczny w Ełku

02 — Public sector and education

  • Municipal School Complexin Nowogród
  • Universityof Warsaw
  • Primary School No. 9John Paul II, Ełk
  • Town HallStawiski
  • Administrative CentreCiechanów

The types of units we service

Compact air handling unit - air handling unit service

Compact units

We diagnose and service modular compact units where the fan, heat exchanger, filters and controls all sit in one casing.

Supply and extract air handling unit - air handling unit repair

Supply and extract units

We look after units with heat recovery and a full supply and extract path, keeping airflows, controls and heat exchangers in shape.

Ceiling-mounted air handling unit - service and filter replacement

Ceiling-mounted units

We service units mounted under the ceiling, where quick access, clean filters and correct fan operation are what count.

Large floor-standing industrial air handling unit - unit service

Industrial units

We inspect and repair large sectional units for halls, production plants and public buildings.

What we service

Units

  • Air handling units — compact, ceiling-mounted, supply and extract, floor-standing

Controls

  • Control system replacement

  • Controller replacement (uPC, Klimor, Clima Gold, VBW)

  • Sensors for temperature, humidity, pressure and carbon dioxide

Components

  • Filter replacement (G4, F7, F9 and HEPA classes)

  • Replacement and repair of inverters

  • Actuators for fire and shut-off dampers

  • Repair of fans and drive motors

What you get when you call

What does a loss of communication with the supply fan mean?Why is the controller reporting an inverter fault?Why won't the unit start after the alarm is cleared?Can a temperature sensor fault shut down the whole unit?
What if supply air runs but extract air won't start?Why is airflow still weak after a filter change?What does a heating coil frost protection alarm mean?Can the unit run without a working damper?
Why does the controller keep losing the module connection?Why does the breaker trip when the fan starts?What does a filter pressure switch fault mean?Why isn't heat recovery running despite a run signal?
01

Remote diagnosis while we talk

Describe the symptom, give us the make and model. During working hours we usually come back to you with a first diagnosis the same day.

02

On-site inspection

If we happen to be in your area, the inspection can come without a call-out charge. Otherwise travel is charged, but you are under no obligation to give us the job.

03

A quote after the inspection

Sometimes a firm figure straight away. More often a price range with a note on what could widen the scope. The price you see before any work starts.

04

Work delivered within the agreed scope

Nothing reaches the invoice without your approval. If we uncover extra work along the way, we stop and come back to you before adding anything.

What this looks like in practice

April 2026, a public building.

A VTS unit - a school ceremony and an inspection
scheduled for 26 April.

6 April — First visit

The controller was throwing random faults. The diagnosis showed the main board had to be replaced.

8 April — First stage

The main board, controller and temperature sensors were replaced. Once fitted, the new board turned out to be incompatible with the older inverters because of the gap in hardware generations.

13 April — Second stage

Inverter replacement.

Unit ready 13 days ahead of the deadline

26 April — Client's deadline

Almost a two-week buffer before the ceremony and the inspection.

Need an urgent call-out?

Call